新闻动态
Position:
Homepage
/
/
March 2015 to November 2015

March 2015 to November 2015

(Summary description)Nantong Sino-Viking Pipe Industry Co., Ltd. completed the installation of all the piping systems in the engine room, the hydraulic lifting of the pile legs and the hydraulic system of the windlass for the 1000T wind power ship.

March 2015 to November 2015

(Summary description)Nantong Sino-Viking Pipe Industry Co., Ltd. completed the installation of all the piping systems in the engine room, the hydraulic lifting of the pile legs and the hydraulic system of the windlass for the 1000T wind power ship.

Information

Nantong Sino-Viking Pipe Industry Co., Ltd. completed the installation of all the piping systems in the engine room, the hydraulic lifting of the pile legs and the hydraulic system of the windlass for the 1000T wind power ship.

Scan the QR code to read on your phone

Related News

Contact Us

Add: Room 421-424/Room 909, Building 2, No. 58, Chongchuan Road, Nantong City

Feedback

Please leave your valuable comments or suggestions and contact information (email or phone) so that we can reply you in time!

Username used for comment:
客户留言
Description:
验证码

Nantong Sino-Viking

Main business items: design of ships and marine engineering, technical consultation of ships and marine engineering, general contracting of construction of ships and marine engineering; construction and supervision of water and underwater projects. The products provided include ballast water backwash filters, ship dredging equipment manufacturing, LNG gas supply systems and ship energy-saving devices.

2021  Nantong Sino-Viking Marine Engineering Co., Ltd.   苏ICP备2021032435号-1    Powered by:www.300.cn