产品与服务
Position:
Homepage
/
Engineering Construction

Products

& services

Engineering Construction

Description:
Description:
Information

Engineering Construction

 

1. Sino Viking participated in the construction of the "Zhenhai No. 1", "Zhenhai No. 2", "Zhenhai No. 3", "Zhenhai No. 5" and "Zhenhai No. 6" drilling platforms constructed by Zhenhua Heavy Industry. And all of them have been successfully delivered, and their performance has been highly recognized by classification societies and major drilling companies.

2. Sino Viking participated in the construction of the jack-up gravel laying and leveling vessel "Yihang Jinping 2". "One Voyage Jinping 2" is an upgraded version of the "Jinping 1", the meritorious ship for the deep-water leveling of the Hong Kong-Zhuhai-Macao Bridge. Compared with "Jinping 1", "Yihang Jinping 2" has caught up and surpassed in terms of performance, specifications, and degree of localization. The ship has a wider laying range and higher leveling efficiency. The leveling speed is higher than that of "Jinping 1". "It is doubled, up to 5 meters per minute; the operating life is longer, and the life of the legs is up to 2000 hours.

3. Sino Viking participated in the construction of the "Three Gorges Rudong Offshore Wind Power Flexible DC Transmission Project Offshore Converter Station". The "Three Gorges Rudong Offshore Wind Power Flexible DC Transmission Project Offshore Converter Station" project is a domestic flexible DC power transmission project with high voltage level, large capacity and long offshore transmission distance. It is located between the Three Gorges Rudong H6 offshore wind farm and the H10 offshore wind farm. The north side of the sea area is about 70 kilometers offshore, with a rated transmission capacity of 1,100 MW. As the "heart" of the entire offshore converter station, in the future, it will be responsible for gathering a total of 1,100 megawatts of electric energy from the three major offshore wind farms of Rudong H6, H8 and H10, and transmit the electric energy to the onshore converter station through the DC submarine cable. After being inverted by the onshore converter station, it is connected to the Jiangsu power grid through a 500 kV AC line. The flexible DC transmission technology adopted by it has many advantages such as convenient and quick reversal of power flow, rapid power supply recovery after an accident, and black start. It will provide valuable construction experience and technical support for the development of deep-sea large-capacity offshore wind farms in my country.

 

"Zhenhai No. 1" Jack-up Drilling Platform

 

"Zhenhai No. 2" jack-up drilling platform

 

"Zhenhai 3" Jack-up Drilling Platform

 

"Zhenhai No. 5" jack-up drilling platform

 

"Zhenhai No. 6" jack-up drilling platform

 

Sino Viking participated in the successful launch of "One Flight Jinping 2"

 

Three Gorges Rudong Offshore Wind Power Flexible DC Transmission Project Offshore Converter Station

 

The Shipment Ceremony of the Offshore Converter Station Project of the Three Gorges Rudong Offshore Wind Power Flexible DC Transmission Project

 

Sino Viking participates in the underwater pipeline construction of Guangzhou Salvage Bureau

Scan the QR code to read on your phone

Contact Us

Add: Room 421-424/Room 909, Building 2, No. 58, Chongchuan Road, Nantong City

Feedback

Please leave your valuable comments or suggestions and contact information (email or phone) so that we can reply you in time!

Username used for comment:
客户留言
Description:
验证码

Nantong Sino-Viking

Main business items: design of ships and marine engineering, technical consultation of ships and marine engineering, general contracting of construction of ships and marine engineering; construction and supervision of water and underwater projects. The products provided include ballast water backwash filters, ship dredging equipment manufacturing, LNG gas supply systems and ship energy-saving devices.

2021  Nantong Sino-Viking Marine Engineering Co., Ltd.   苏ICP备2021032435号-1    Powered by:www.300.cn